In a traditional system, your entire production plan breaks down when someone calls in sick. With Woosh, simply log the absence and recalculate the entire schedule of all production orders with one click.
Instead of moving hundreds of tasks by hand, our one-click re-planning feature redistributes the workload seamlessly.
See exactly who is doing what and when on the Gantt chart, so you can easily spot who is at full capacity and who has free time.
When a worker (like Mia) reports sick, quickly register their time off in the system and get management approval.
Instead of manually dragging blocks around, hit the re-plan button to recalculate the entire schedule of all production orders instantly.
Tasks previously assigned to absent workers are seamlessly covered by available staff (like Liam). The schedule updates based on who is actually on the shop floor today.
Welcome to the AI powered system for bespoke manufacturing. Never let unexpected events derail your confirmed orders again.
Instantly see how tasks are redistributed when reality on the shop floor changes.
The system automatically searches for workers with the required skills and available capacity, smoothly transferring tasks from absent employees to active ones.
The Gantt view clearly highlights which operators are overloaded and who has the bandwidth to take on newly shifted tasks.
Status: March 2026 - Processing Absences
| Production Order | Task | Original Assignee | New Assignee | Status |
|---|---|---|---|---|
| MO-4011 | Panel Cutting | John Doe | John Doe | On Track |
| MO-4012 | Edge Banding | Mia | — | Absence Logged |
| MO-4012 | Edge Banding | Mia | Liam | Reassigned |
| MO-4015 | CNC Machining | Mia | — | Absence Logged |
| MO-4015 | CNC Machining | Mia | Liam | Reassigned |
Auto-replanning works seamlessly across your entire manufacturing stack.
Read and write directly to your Odoo Manufacturing modules, ensuring your master production schedule is always accurate.
Log sick leave, holidays, or shift changes and instantly see the impact on your shop floor capacity.
When management hits replan, operators instantly see their newly assigned tasks on their tablets. Everyone knows exactly what to do.
Common questions from planners before turning on auto-replanning.
No. While it can be fully automated, management often prefers the manual "one-click" function to keep absolute control over production planning before committing changes.
The system constantly reads your Gantt chart data. It identifies who is at full capacity and who has free time, assigning tasks to those with the required skills and availability.
Log all absences in the system. The replan engine will recalculate the entire schedule. If there isn't enough capacity to protect deadlines, it will flag the bottleneck instantly.
Not at all. You can hit replan if a machine goes down, if a previous job runs long, or if materials arrive late. It adjusts to reality.
Book a demo and we will simulate a broken schedule and fix it in real-time. Say goodbye to manual drag-and-drop planning.